Project Description
Chemical water treatment plant in 2007
- Retrofit of 1600 A main circuit breakers in the feeder panels of switchboards
- Replacement of outdated automatic back-jump relay by a programmable automatic machine
Reconstruction of preparation and dosing of chemicals and reactor clarifiers
- Reconstruction of motor
- Installation
- Supply of switchboards
- Engine control using frequency converters
- Supply and installation of instrumentation control system
- Reconstruction of lighting in buildings of preparation and dosing of chemical and reactor clarifiers
Repair of HCL and condensate tank level sensors
-
Supply of radar level transmitters, installation and connection to the control system
Apparatus for monitoring ebulating pumps
- Supply and installation of measuring and control systems
- Supply and installation of LV cables
Installing the billing meters for external customers
- Development of project documentation
Replacement of the control and information system at the construction of Hydrokrak, Slovnaft, Inc., Bratislava
- Installation and activation of the Yokogawa CS 300 control system
- Production and installation of input-output intrinsically safe boxes and control system and power supply cabinets
Supply, installation, testing and commissioning of HRP7:
- Outdoor LV and HV cable distribution systems
- Modification to and additional equipment for HT4
POLYPROPYLENE 3
- PJ260 – outdoor LV and HV cable distribution systems
- PP3 – Reconstruction of analytical samples
- Design, delivery, dismantling, assembly and commissioning