Project Description

Chemical water treatment plant in 2007

  • Retrofit of 1600 A main circuit breakers in the feeder panels of switchboards
  • Replacement of outdated automatic back-jump relay by a programmable automatic machine

Reconstruction of preparation and dosing of chemicals and reactor clarifiers

  • Reconstruction of motor
  • Installation
  • Supply of switchboards
  • Engine control using frequency converters
  • Supply and installation of instrumentation control system
  • Reconstruction of lighting in buildings of preparation and dosing of chemical and reactor clarifiers

Repair of HCL and condensate tank level sensors

  • Supply of radar level transmitters, installation and connection to the control system

 

Apparatus for monitoring ebulating pumps

  • Supply and installation of measuring and control systems
  • Supply and installation of LV cables

Installing the billing meters for external customers

  • Development of project documentation

 

Replacement of the control and information system at the construction of Hydrokrak, Slovnaft, Inc., Bratislava

  • Installation and activation of the Yokogawa CS 300 control system
  • Production and installation of input-output intrinsically safe boxes and control system and power supply cabinets

 

Supply, installation, testing and commissioning of HRP7:

  • Outdoor LV and HV cable distribution systems
  • Modification to and additional equipment for HT4

POLYPROPYLENE 3

  • PJ260 – outdoor LV and HV cable distribution systems
  • PP3 – Reconstruction of analytical samples
  • Design, delivery, dismantling, assembly and commissioning